As of November 20, 2007 the IT department has established remote control functions for telephone system repairs.  This means that if the IT department is unable to repair a phone issue we can call the company who installed the phone systems for us and have them address the problem from their office.  As of March 11, 2008 re have established remote repair options for RHS, LRES and the SAU building.  We are working on getting these options installed at IHGM but since we use a different telephone provider at this location we have encountered some delays.
     
Cost Savings:
      
           The addition of remote control repair will help SAU 33 save costs with regards to phone repair issues.  The repair charge for remote work is considerably cheaper than an onsite visit, and boasts a faster repair time, so in this case we actually will get better service with a cheaper price! 

SPEED:

             Have you noticed telephone repairs being done more quickly?  Remote repairs allow us to achieve MUCH faster results.  In many cases we have had problems repaired within hours of receiving a repair request in school dude!
 
REMOTE LOCATIONS:

Remote functions have been established for the SAU building, Raymond High School and Lamprey River Elementary School.  Over the coming days we will be working on establishing remote control options for the middle school.
 

      How do you report a telephone issue? 

  1. Report the telephone problem through School Dude.
     
  2. The IT staff will determine if the repair is something we will fix or if we will have the phone company address.
     
  3. When you make your report please include the extension number as well as the mailbox number (if that is also a problem)  Please try and be as specific as possible when making your report.

    How will you know a problem has been fixed? 

    By reporting it through School Dude you can check back from time to time to see if we have completed the repair.  We will always write a short note as to the work that was done.  School Dude will show you all your repair requests, both outstanding and completed.

         As the new IT staff gets settled in more exciting upgrades of this nature are on the horizon! 

 